ONGOING

Retrieve and drop off mail to cabinet on first floor

MORNING

Wash coffee maker, wipe coffee pot, make Coffee

Complete building walk through for Guggenheim conference rooms

Check GUG 211A to ensure all Morning Walkthrough:

Guggenheim 2nd Floor -

GUG 211D Conference Room 

  • Straighten chairs.

  • Ensure the computer is plugged in and tech is in standby mode.

  • Wipe down surfaces.

GUG 211K Kitchenette/Copy Room

  • Make coffee.

  • Refill paper in the copier if needed.

  • Clean and tidy if needed.

GUG 211A Package Room

  • Make sure packages are labeled, sorted, and organized on the shelves.

...

START OF EACH SHIFT

Log into Teams

Check the Frontdesk Passdown Channel

Check laminated recurring task sheet 

Check voicemail

Check three GUG screens

END OF EACH SHIFT

Write a new comment in the Frontdesk Passdown Channel with the date and shift times covered as the header. The comment should include any loose-ends you may have not addressed or information that needs to be shared. 

LOCK SAFE UPON CLOSING

Tidy work area

END OF THE DAY

Clean copy room

Wipe down kitchen

Clean Coffee Station

Check conference room and turn off lights

Straighten waiting area

Lock the package room

Do Security Check - are doors closed that need to be closed in GUG? 

Check paper levels in copiers in Main Office, Gug 3rd floor, and computer lab. (AERB 241 will email front desk if they need paper).

WEEKLY

Check coffee stock, Monday morning. Tell Kim if we need more.

Send out email to core staff for supplies, Wednesday morning

Check office supplies/place order, Friday (1pm)

Audit the package room and package pick-up list, Monday morning

Throw out any piles of general magazines that were left for pick up by the mailboxes.  If anyone’s mailbox gets too full, arrange to drop it off in their office, Monday morning

...

GUG 205 Undergraduate Denton Study Room

  • Straighten up if needed.

  • Ensure no hazardous materials are left out.

GUG 212 AA Computer Lab 

  • Remove any personal belongings and put them in lost and found.

  • Ensure all computers are plugged in.

  • Ensure hallway TV screens are working. Check the wiki for instructions if not.

Guggenheim 3rd Floor -

GUG 305 Meeting Room

  • Straighten tables and chairs (U shape configuration)

  • Wipe down surfaces.

  • Ensure blinds are open.

GUG 309 Kitchen

  • Clean and tidy if needed.

  • Restock supplies (soap, paper towels, cleaner, sponge, etc.) when needed.

GUG 3rd Floor Copier

  • Refill paper if needed.

GUG 311, 316, 318 Suites

  • Clean and tidy if needed.

  • Ensure hallway TV screens are working. Check the wiki for instructions if not.

AERB - 

AERB 130

  • Straighten up chairs.

  • Wipe down surfaces.

  • Ensure the tech touchpad is responsive. Tell David if there are any tech issues.

AERB 241

  • Refill paper in the copier if needed.

  • Wipe down surfaces.

End of Day Walkthrough:

  • Ensure doors are closed.

  • Lock safe.

  • Lock package room.

  • Clean out the coffee maker and tidy kitchen spaces.

  • Turn off lights.

Daily/Ongoing

  • Check and process mail.

  • Check voicemail.

  • Check and process room reservations.

  • Check and triage emails.

  • Check shared supplies and add to the order list when needed.

  • Keep the front desk/waiting area clean and tidy.

Weekly:

  • Update software in conference rooms.

  • Order office supplies.

  • Audit packages

  • Audit safe.

  • Make sure building signage is up-to-date.